Prompt Kit

Long-Running Work Companion

Markdown

Long-Running Work Companion

Examples, worksheets, and prompts for reasoning about sustained AI work, individually and with a team.

This companion goes with Nate's post on long-running AI agents. It builds on the Working Context Starter Kit. Use the starter kit's existing files for current project information; use this companion to investigate failures, design continued work, and coordinate contributors.

All companies, amounts, dates, project records, and outcomes in the practice cases below are fictional. The worked answers explain reasoning. They are not reports of successful live agent runs. The trials are exercises for you to perform in your own environment, where support and results may differ.

Start here

Useful longer work needs a purpose, evidence of progress, feedback, retained understanding, and a way to change direction. Your software also needs to support the necessary actions, access, checking, and continuation. A prompt can guide those capabilities; it cannot create a missing capability.

Read a worked case first. Before opening its practice answer, write down what you think happened and what evidence you would inspect next. Then compare the explanation with yours. Once the reasoning makes sense, apply the worksheets and prompts to a real project you can already access.

You can copy each labeled record into a separate text file, or paste the records into a chat under their labels. Preserve the labels so a claim can point to a specific source. A tool's statement that it used a source is weaker evidence than an observable retrieval record and a result checked against that source.

Choose the path that fits your situation:

  • Individual: understand an attempted result, change the relevant part of the assignment or context, and test whether the improvement survives a fresh session and a changed detail.
  • Team: use the same reasoning, then test shared methods, source ownership, working versions, decision responsibilities, and review across contributors.
  • A correction that keeps coming back: run Prompt 1 on the latest wrong output, apply the fix its leading cause supports, then run "A correction survives" (under Harmless challenges) in a fresh session.

A small trial helps you understand an ambitious project. You are not committing to keep the project small. You are gathering evidence about what will support more independent work.

Case 1: Research changes the question

Records for the worked case

R1 — Initial assignment

A product team wants to understand why activation declined after a redesign. Activation means completing the first successful export within seven days of signup. The team asks an agent to investigate possible causes and identify evidence that would affect the next product decision.

R2 — Findings from the first investigation

The desktop activation rate was nearly unchanged. The mobile activation rate fell. Support conversations include complaints about both pricing and a confusing upload error. The pricing complaint count is not broken out by device. There was no price change during the redesign.

R3 — Current decision from the product lead

Investigate the mobile upload problem first. Establish whether affected users can recover and whether the error occurs in the redesigned path. Preserve pricing as an unresolved alternative. Do not conclude that pricing is irrelevant.

R4 — Agent's later output

The agent produces a broad summary of pricing complaints and requests permission to collect a larger sample of them. It does not investigate mobile upload behavior. The available retrieval record shows that it read R1 and R2 but did not read R3.

Worked reasoning

The observed problem is that the next effort did not follow the current investigation decision. The retrieval record points to the wrong-source cause: the current decision existed, but the agent worked from the original assignment and earlier findings without loading it. That does not establish that the agent is incapable of investigating the mobile problem.

A useful change is to put the current investigation direction where the next run is instructed to read it. Preserve the reason: the device difference makes mobile behavior worth investigating, while the pricing evidence remains incomplete. Point to R1 and R2 for background rather than rewriting the whole project around a definitive mobile-only conclusion.

A useful next result would describe the mobile upload failure, whether users can recover, and what the evidence establishes about the activation decline. If the agent lacks access to the app or relevant records, it should identify that missing capability and propose an available next investigation. It should not claim to have reproduced a behavior it cannot observe.

The test is whether a fresh attempt loads the current direction and performs the relevant work, or clearly identifies why it cannot. Count documents read only if that helps interpret the result. More documents alone do not establish progress.

Practice case: What would change your mind?

Now give the agent these additional records:

R5 — New investigation result

The upload error reproduces on mobile, but the event definition used in the original activation report counted a successful export incorrectly on some mobile sessions. The analyst has not yet recalculated the decline using the corrected definition.

R6 — Proposed next action

The agent proposes to redesign the entire mobile upload process immediately, arguing that R3 already established it as the cause of declining activation.

Before reading the answer, write down:

  1. What is observed, and what conclusion remains uncertain?
  2. Should the earlier decision still govern the next action unchanged?
  3. What result would most improve the next product decision?

Answer discussion

R5 establishes a reproducible upload problem and a problem with the measurement. It does not establish how much the upload problem explains the measured decline. R3 chose an investigation priority; it did not settle the cause.

A useful next move is to correct the measurement and assess the upload issue using evidence appropriate to the decision. Some remediation may be justified by the reproduced defect even if the activation effect remains uncertain. The team should separate fixing an observed problem from claiming to have explained a metric.

The general lesson is that retaining a decision is insufficient if the agent treats a provisional investigation choice as a permanent conclusion. Update the current state and affected tasks while preserving the reason for the change. If the data needed for recalculation is inaccessible, record that limit and the decision it prevents.

Case 2: A check passes while the user task fails

Records for the worked case

B1 — Intended result

A user can upload a CSV, see a useful error for a malformed file, correct the file, and successfully upload again without reloading the page.

B2 — Implementation check

A request to the upload endpoint with a valid CSV returns HTTP 200. The agent records that response and marks the upload feature complete.

B3 — Observed interaction

After a malformed CSV, the page shows an error. The submit button stays disabled even after the user selects a corrected file. Reloading the page restores the button.

B4 — Available tools

The agent can inspect and edit the application code and run endpoint checks. Browser automation is available in a disposable development environment.

Worked reasoning

B2 establishes that one valid request succeeded. B1 requires a complete recovery interaction. B3 is direct evidence that the interaction fails. The check and the requirement cover different things.

A useful change includes repairing the relevant behavior and adding a check that actually exercises the malformed-file-to-corrected-file sequence. Preserve the failure evidence so the repair can be assessed. The test should start from the same condition that exposed the failure and establish whether the user can complete the intended action.

Do not change B1 merely to make B2 sufficient. If the requirement truly needs to change, identify why and obtain the responsible decision. The agent may propose implementation details, but a green response code cannot decide what the user should be able to do.

Practice case: The agent cannot see the screen

Change B4:

B4a — Available tools

The agent can inspect code and run endpoint checks. It has no browser access, and the user has supplied only a screenshot of the initial error.

B5 — Agent conclusion

The agent edits the error-handling code and says, “The issue is fixed; I ran the endpoint test successfully.”

Decide what can be claimed, what remains unverified, and what should happen next.

Answer discussion

The code changed and an endpoint check passed. The full interaction has not been verified. A screenshot of the initial error does not show whether the corrected file can be submitted after the change.

The agent should identify the missing observation. A person can perform the interaction, or a supported browser testing capability can be added. An appropriately scoped code-level test may provide useful evidence, but it should be described according to what it actually exercises. Keep the remaining uncertainty explicit.

This is a capability gap in the current environment, not something that “be more thorough” automatically repairs. A useful report names the change, evidence collected, and the specific behavior still needing verification.

Case 3: The team has current information but conflicting authority

Records for the worked case

T1 — Approved deal record, version 7

Owner: account lead. Approved price: $18,000. Approved delivery: June 22. Scope: a research brief and a presentation. Only the account lead can approve changes to price, scope, or delivery commitments.

T2 — Older proposal example

Price: $15,000. Delivery: June 15. This example is supplied for presentation style; it is not the current deal record.

T3 — Client email received after T1

“Could we receive everything on June 15 instead? We would like to use it at an earlier meeting.”

T4 — Shared drafting method

Use the approved deal record for commercial terms. Use prior proposals for presentation examples. Keep a separate working version. Check the finished terms against the approved record. Bring unapproved or conflicting commitments to the account lead. Notify the assigned reviewer when the current draft is ready, using an available authorized communication mechanism.

T5 — Draft and retrieval record

The draft contains $15,000 and June 15. The agent retrieved T1, T2, T3, and T4. Its explanation says it preferred the most recent request and the older proposal's complete wording.

Worked reasoning

The current record and shared method were available and retrieved. The draft still violates the approved terms. Adding those documents again would not establish a repair.

The price came from an example that T4 says should guide presentation. The date came from a request that has not been approved. Correct the draft against T1, preserve the client's request, and prepare a decision for the account lead. Then check the actual finished terms. If the agent repeatedly fails despite clear information and checks, investigate its ability to perform the task or change the division of work.

A useful decision request identifies the June 15 request, the June 22 commitment, and the consequences of changing it. It does not claim the client approved a scope reduction or that the team accepted the earlier date. The writer can continue independent portions of the brief while the commitment remains unresolved.

Practice case: Both drafts look reasonable

Add these records:

T6 — Approved deal record, version 8

The account lead approved June 15 for the research brief only. The presentation remains due June 22. Price remains $18,000. Version 8 supersedes version 7 for delivery dates.

T7 — Contributor A

Started from version 7. Draft A says both deliverables arrive June 22. Contributor A finished before seeing version 8.

T8 — Contributor B

Started from version 8. Draft B says the brief arrives June 15 and the presentation June 22. It also changes the price to $17,000 without an approval record.

T9 — Review situation

Both contributors want to replace the shared draft. The reviewer has not been told which base version each used.

Choose what to preserve, what to change, who must decide, and what the reviewer needs to receive.

Answer discussion

Preserve both contributions so useful work is not lost. Neither is ready to replace the shared draft unchanged. A is based on superseded delivery terms. B uses the current dates but includes an unapproved price change.

Reconcile the draft against version 8: brief June 15, presentation June 22, price $18,000. Keep any proposed $17,000 price as a proposal requiring a decision rather than an approved fact. Record which version each contribution used and show the reviewer the reconciled working version and the relevant changes.

A check that only compares modification timestamps would be inadequate. The newer contribution can still contain an unauthorized change. A clean text merge also does not establish that the commercial terms agree. Check the meaning of the combined result against the current approved record.

Worksheet 1: Understand what happened

Use this before choosing a fix. Link to evidence rather than copying an entire project history.

Filled example

  • Intended result: a proposal using approved commercial terms.
  • Observed result: $15,000 appears where the approved record says $18,000.
  • Evidence: T1, T2, T4, and the retrieval record in T5.
  • Plausible explanation A: the approved record was unavailable. Evidence against: T5 shows it was retrieved.
  • Plausible explanation B (cause 4, correct source retrieved, wrong result): the agent treated an example as authority. Evidence for: T5's draft and explanation, checked against T1/T2/T4.
  • Missing evidence: whether a finished-output comparison was performed; the current record does not show one.
  • Next inspection: compare every commercial term in the finished draft with T1 and distinguish requests from approvals.
  • Proposed change: repair the terms and require a visible comparison as part of the work.
  • Prediction: a new case with different terms uses the approved record and flags an unapproved request.
  • What would weaken the diagnosis: repeated failure after the correct comparison is performed, suggesting a further execution or capability problem.

Partly filled exercise

  • Intended result: B1's complete recovery interaction.
  • Observed result: B3's disabled submit button.
  • Evidence available: B1–B4.
  • Plausible explanation A: the endpoint is always unavailable. Evidence for/against: ______
  • Plausible explanation B: the check omitted the recovery interaction. Evidence for/against: ______
  • Missing evidence: ______
  • Next inspection: ______
  • Proposed change and prediction: ______

Compare your answer with the building case discussion after completing it.

Blank worksheet

  • Project and intended result:
  • What happened, stated as an observation:
  • Evidence links or record labels:
  • Which of the four causes fits (never recorded / other source used / records disagree / correct source, wrong result), plus any other explanation:
  • Evidence for and against each:
  • What you cannot yet establish:
  • Next useful inspection or small trial:
  • Proposed change, if the evidence supports one:
  • Predicted result:
  • What would make you revise your explanation:

Worksheet 2: Design the next stretch of work

Filled example

  • Current outcome: identify useful evidence about the mobile activation problem.
  • Current uncertainty: the measurement error in R5 prevents a confident claim about the size and cause of the decline.
  • Next useful result: corrected activation analysis and a separate account of the reproduced upload defect.
  • What could change the plan: the corrected analysis substantially changes the device difference, or new evidence changes the likely impact of the upload issue.
  • Checks and limits: confirm event definitions; inspect reproducible upload behavior; do not infer causation from complaint counts alone.
  • Information to retain: source definitions, current investigation decision, reproduced defect, rejected explanations with reasons, and unresolved questions.
  • Human judgment: decide remediation priority and whether the broader research question should change.
  • Required capabilities: access to relevant data and a supported way to inspect the upload behavior.
  • Continuation point: save the analysis and evidence with the current next question before changing sessions.
  • Stop or ask: missing data prevents the planned comparison, evidence contradicts a binding assumption, or prioritization requires a product decision.

Partly filled exercise

  • Current outcome: B1's user can recover from a malformed upload.
  • Known evidence: endpoint succeeds for a valid file; UI recovery fails.
  • Next useful result: ______
  • Check that would distinguish repair from an unchanged defect: ______
  • What the check would leave untested: ______
  • What must survive a new session: ______
  • Capabilities missing under B4a: ______
  • Human decision or verification needed: ______
  • Completion evidence: ______

Blank worksheet

  • Current outcome and what remains uncertain:
  • What the next work should produce or reveal:
  • Findings that would change the plan:
  • Checks, evidence standards, and their limits:
  • Work and understanding that must survive:
  • Current sources and how to retrieve them:
  • Decisions the agent may apply:
  • New judgment that requires a person:
  • Required tools, access, and continuation behavior:
  • Evidence those capabilities exist:
  • Review/recovery point:
  • Conditions for continuing, waiting, asking, changing approach, or finishing:

Worksheet 3: Agree how the team will work

Filled example

  • Shared outcome: deliver the brief and presentation under the current approved terms.
  • Governing source: T6, deal record version 8; account lead owns changes.
  • Shared method: T4, with delivery checks tied to the active deal version.
  • Common requirements: approved price, scope, delivery dates, and required review.
  • Useful independence: contributors can propose different explanations or presentation approaches within those requirements.
  • Writer's responsibility: create and check a separate working draft; propose changes without approving commercial commitments.
  • Account lead's responsibility: resolve commercial choices and update the deal record.
  • Reviewer's responsibility: assess the current reconciled version against the requirements.
  • Access to verify: each role can read the material it needs; actual write/approval restrictions match intended responsibilities where enforced.
  • Working versions: preserve A and B and identify their base versions; do not overwrite one silently.
  • Review event: reconciled draft ready, with the decision record and changes attached or linked.
  • Communication mechanism: a person or an authorized tool sends the review request; availability must be checked.
  • Completion evidence: correct terms in the delivered working version, completed required review, and recorded unresolved matters.

Partly filled exercise

A research team assigns one agent to test a price explanation and another to test a reliability explanation.

  • Shared definitions and evidence standards: ______
  • What should remain independent in the investigations: ______
  • Current source owner and decision owner: ______
  • How a new finding reaches the other contributor without forcing agreement: ______
  • What requires reconciliation before the final recommendation: ______
  • Who decides if the question itself should change: ______
  • Actual review/notification mechanism and how to verify it: ______

Blank worksheet

  • Shared outcome:
  • Current authoritative sources and responsible owners:
  • Shared method and maintainer:
  • Requirements contributors must apply consistently:
  • Areas for independent investigation or judgment:
  • Roles: what each may read, change, propose, and approve:
  • Effective permissions and evidence checked:
  • Working versions and base versions:
  • How new information is retrieved and how freshness is recorded:
  • Events requiring a decision or review:
  • Person responsible for each decision:
  • Supported communication and continuation mechanisms:
  • How conflicting contributions are preserved and reconciled:
  • Completion evidence and accountable owner:

Worksheet 4: Learn from the trial

Filled example

This is an illustrative interpretation, not a live test report.

  • Prediction: a fresh research session will apply the current investigation priority without treating it as a settled conclusion.
  • Actual result in the example: R6 treats the mobile investigation priority as proof of causation and proposes a complete redesign.
  • Evidence: R3, R5, and R6.
  • What worked: the session carried forward the mobile priority.
  • What failed: it lost the distinction between an investigation choice and an established explanation.
  • Cost or effort: not measured in this fictional example; do not invent a time saving.
  • Questions raised: none about the measurement uncertainty, although that uncertainty affected the decision.
  • Revised understanding: continuity preserved some information but overstated its meaning.
  • Next change: mark provisional decisions and unresolved evidence explicitly; require the next recommendation to address R5.
  • Next trial: a changed case in which the preferred explanation remains plausible but is not yet established.
  • Scope of conclusion: this example supports revising how provisional decisions are represented; it does not establish a general model limitation.

Partly filled exercise

  • Prediction: T7 and T8 can be combined into a draft consistent with version 8.
  • Observation: a new combined draft uses B's current dates and B's unapproved $17,000 price.
  • Evidence to inspect: ______
  • What worked: ______
  • What failed: ______
  • Question that should have been raised: ______
  • Next change: ______
  • Next trial and what it could establish: ______

Blank worksheet

  • Prediction and reason:
  • Actual actions and result:
  • Evidence inspected:
  • What improved:
  • What remained wrong or uncertain:
  • Repeated explanations or corrections:
  • Necessary questions raised; unnecessary questions asked:
  • Version or coordination problems:
  • Recovery or continuation behavior observed:
  • Time, model/tool cost, and human review effort if measured:
  • Revised explanation:
  • Next change or decision:
  • Next trial or reason to extend the work:
  • What this evidence does not establish:

Five prompts to use with your agent

Paste each prompt as written. The agent will ask you for what it needs. Keep your existing access and action boundaries explicit.

Prompt 1: Examine an attempt

Help me understand an attempted result before we choose a fix.

Before you start, ask me for the following, two at a time, and wait for my answers:
1. The project and the result I intended.
2. The actual attempted result (a file, link, pasted output, or record label).
3. The current sources and decisions that apply.
4. Which sources and tools you may use.
5. My own interpretation so far, or "not yet formed."
If I can't give you 1 and 2, stop and tell me what you'd need to begin. For anything else I can't supply, mark it "not provided" and say how that limits the work.

Inspect the supplied material. Separate what you can observe from what you infer. Test the mismatch against four causes first. (1) The decision was never recorded where the agent could access it. (2) The record existed, but the agent used another source, such as an old example. (3) Two approved-looking records disagree. (4) The agent retrieved the correct information and still produced the wrong result. Then consider whether a check was inadequate or the model could not perform the task. For each, name evidence that supports it, evidence against it, and what we cannot yet establish. Several causes may coexist. If the evidence favors one, name it as the leading cause and the trial that would confirm it.

Before recommending a fix, show what you can establish from the work and what we would need to inspect next. If the available record cannot show what happened, propose a small trial that makes the relevant behavior observable. Do not treat an agent's retrospective explanation as proof of its actions.

Compare your findings with my interpretation and say where they differ. Explain the reasoning in ordinary language. Ask only for missing information that materially affects the investigation. Do not change project records or take external actions under this prompt. Don't invent evidence, retrieval history, tool capabilities, or results you weren't shown. If something is unclear, ask. End with the most useful next inspection, and a proposed correction only where the evidence supports one.

Format: Observed / Inferred / Four causes (supported / ruled out / unknown, with evidence) / Leading cause / Next inspection / Correction (only if supported). Under 500 words unless I ask for more.

Prompt 2: Compare ways the work could continue

Help me design the next stretch of this project.

Before you start, ask me for the following, two at a time, and wait for my answers:
1. The outcome and the current phase.
2. The diagnosis and evidence so far.
3. Current uncertainties and decisions.
4. Available tools, sources, and access, including unknowns.
5. Time and cost constraints and human availability.
6. Existing authority and actions that require a person.
If I can't give you 1 and 2, stop and tell me what you'd need to begin. For anything else I can't supply, mark it "not provided" and say how that limits the work.

First explain what useful progress would mean now and what the next work should reveal. Distinguish the outcome from the current plan.

Propose a suitable arrangement for continued work and a plausible alternative. Explain the tradeoff between them. For each, cover actions, checks and their limits, what must be retained, human decisions, dependencies, continuation/recovery, and stopping. Explain what finding or changed condition would make you prefer the alternative.

Distinguish choices about the work from capabilities that software must actually support. Mark capability claims as observed, documented but untested, unsupported, or unknown. Do not assume that a prompt supplies persistence, notifications, access controls, or safe retries.

Use examples from this project rather than a generic checklist. Do not change files or implement the design yet. Don't invent evidence, retrieval history, tool capabilities, or results you weren't shown. If something is unclear, ask. End with the decisions we can make now and the consequential evidence or judgment still missing.

Format: What progress means now / Option A / Option B (each as a short table: actions, checks, retained information, human decisions, capabilities with status, stop conditions) / What would flip the choice / Decisions we can make now. Under 800 words.

Prompt 3: Prepare continued work

Prepare usable assignment material for the design we have chosen.

Before you start, ask me for the following, two at a time, and wait for my answers:
1. The design we chose and the reasoning.
2. Where the Working Context Starter Kit files or equivalent project records live (in a chat tool, this may be project instructions, uploaded files, or saved memory).
3. The current authoritative sources and their roles.
4. Relevant corrections, failed attempts, and changed decisions.
5. Tools and capabilities already verified.
6. Your authority for this step: read/propose only, or the exact changes you may make.
7. Actions that need additional human judgment or authorization.
If I can't give you 1, stop and tell me what you'd need to begin. For anything else I can't supply, mark it "not provided" and say how that limits the work.

Read the current records before proposing changes. Preserve the distinction between stable methods, current state, available sources, and decision history. Reuse README.md, CURRENT.md, CONTEXT-MAP.md, and DECISIONS.md where present; do not create a competing record of the same work.

Prepare the next assignment, checks, source references, useful recovery point, conditions for receiving changed direction, and conditions for continuing, waiting, asking, or finishing. Preserve exact requirements. Keep provisional judgments provisional. Do not generalize a local exception without a reason.

If I haven't stated authority, treat this as read/propose only. Carry out only changes already authorized for this step. If this is read/propose only, show the proposed material. If changes are authorized, show me the before/after and wait for my go, then make them and read back what was saved. Do not delete source records. Do not send messages or change external commitments unless explicitly authorized.

Report the prepared material, how it uses the evidence, and any unsupported capability that prevents the design from working as intended. A saved instruction is not proof that execution, recovery, or notification is available. Don't invent evidence, retrieval history, tool capabilities, or results you weren't shown. If something is unclear, ask.

Format: the proposed changes as before/after blocks per file, with one line per change on the evidence it uses, then a list of unsupported capabilities. Under 800 words plus the blocks.

Prompt 4: Prepare the team handoff

Help this work continue across contributors.

Before you start, ask me for the following, two at a time, and wait for my answers:
1. The project outcome, decisions, and where the source records live.
2. The existing shared method, or "none yet."
3. The people and roles involved and their responsibilities.
4. The contributions and the version each one started from.
5. Known changes, conflicts, and review needs.
6. Available communication, retrieval, and permission mechanisms.
7. Your authority for this step: the exact reads, changes, and communications you may make.
If I can't give you 1, stop and tell me what you'd need to begin. If I don't know which version a contribution started from, mark it "unknown" and make establishing it your first task. For anything else I can't supply, mark it "not provided" and say how that limits the work.

Inspect the current work and method. Identify what contributors must agree on and where independent judgment is useful. Distinguish facts, reusable methods, proposals, requests, and approved decisions. A recent record is not automatically authoritative.

Prepare or revise the shared method within the stated authority. Specify source ownership, working versions, what each role may read/change/propose/approve, checks, review events, and the person responsible for each unresolved decision. Preserve conflicting contributions until they are reconciled.

Work through one actual or clearly labeled illustrative handoff. Explain how the next contributor receives the current information and how a changed decision reaches affected work. Inspect which notifications and permissions are actually supported; do not claim that written instructions enforce access or create a background process.

If I haven't stated authority, treat this as read/propose only. Never send a message until I've seen its exact text and said go. Perform only already-authorized changes, after showing me each one and getting my go, and verify results. Otherwise prepare the handoff material without sending. Don't invent evidence, retrieval history, tool capabilities, or results you weren't shown. If something is unclear, ask. End with the usable method, the current review/decision request, evidence of what was completed, and remaining implementation or judgment needs.

Format: Shared method (one page max) / Roles table / Reconciled state / Review or decision request, drafted but not sent / Open items.

Prompt 5: Review what happened

Help me learn from this trial and decide what to do next.

Before you start, ask me for the following, two at a time, and wait for my answers:
1. My prediction and the change I tried.
2. My own interpretation of the result. Ask for this before you look at any evidence.
3. The actual outputs, execution records, source versions, and check results.
4. Costs and human review effort actually measured, or "not measured."
5. The current project goal and remaining constraints.
If I can't give you 3, stop and tell me what you'd need to begin. If I recorded no prediction, mark it "none recorded" and say how that weakens the conclusions. For anything else I can't supply, mark it "not provided" and say how that limits the work.

Compare my interpretation with the evidence. Separate observations, inferences, and unknowns. Determine which explanation was supported, what improved, what remained wrong, and whether the trial made a useful distinction between possible causes.

Assess whether a correction survived, whether it was applied appropriately to changed details, whether necessary questions were raised, and whether checks and recovery established what we expected. Do not infer success from an agent's completion message or claim capabilities the trial did not exercise.

Recommend a justified next change, next investigation, human decision, or extension of the work. Explain what would make you change that recommendation. Do not invent cost savings or general reliability from a small trial.

Do not modify the project under this review prompt. Don't invent evidence, retrieval history, tool capabilities, or results you weren't shown. If something is unclear, ask. End with the revised understanding and the next decision we can make from the evidence.

Format: Where my interpretation held / Where it didn't / What the trial distinguished / Next step / What would change it. Under 500 words.

The individual path

Choose an ambitious project you can already access, then a consequential uncertainty or recurring correction within it. Use the research or building worked case to understand the reasoning before applying Prompt 1 to your own attempted result. Complete Worksheet 1 with evidence links.

Use Prompt 2 and Worksheet 2 to compare ways to continue. The next step may involve investigation, production, or a human choice. Choose the arrangement because it fits the evidence and available feedback, not because it resembles a template.

Use Prompt 3 to prepare the project within your authority. The existing starter kit provides a home for current state and source references. Write a prediction about what the next attempt should do differently.

Run the attempt and inspect the result. Then start a fresh session with access to the saved material, without pasting the original conversation. Test a changed detail as well. Record whether the session applies the lesson appropriately, loads current decisions, and identifies missing evidence. A fresh session is not a test of process-crash recovery; inspect that separately if the planned work depends on it.

Use Worksheet 4 and Prompt 5 to interpret what happened. Revise the diagnosis if necessary. Decide whether to extend the work, change its structure, use a different capability, or retain a human step. Keep your records tied to the actual project rather than maintaining a duplicate history in the worksheets.

The team path

Begin with the same diagnosis and design reasoning. Use Worksheet 3 and Prompt 4 to identify shared sources, methods, ownership, working versions, and responsibilities. Confirm that the method is accessible and actually read by the agents involved.

Have two contributors undertake related work using the same current material. Preserve independence where it is useful. Introduce a clearly labeled change to an approved decision in a disposable trial, or observe a real authorized change. Check whether affected work receives it.

Introduce a conflicting contribution and a review need. Preserve both versions, establish the governing decision, reconcile the result, and send the review request only through an authorized mechanism. Verify what reached the next person. If roles are simulated, label the exercise as a simulation; do not claim real identity, permissions, or delivery were tested.

Inspect the combined deliverable against current requirements. Use Worksheet 4 to record recurring corrections, questions, version conflicts, and review effort. Update the method only where the evidence supports a general change. Leave local facts and exceptions with their projects.

The team should finish with a usable shared method, an accountable owner for decisions and updates, known communication and permission behavior, and a concrete explanation of what to improve next.

Inspect the technical capabilities your design needs

Use this record for the environment you actually intend to use. An unknown is a useful result when it prevents an unsupported assumption. In the last column, write one status (observed, documented but untested, unsupported, or unknown) and the evidence behind it.

Needed capabilityWhat to inspectYour evidence and status
Access to current informationCan the agent retrieve the governing record, distinguish it from an example, and use it?
Meaningful action and checkingCan it perform the task and inspect the result that matters?
Continuation across sessionsDoes a fresh session find the current direction, work, evidence, and unresolved questions?
Process recoveryAfter a harmless controlled interruption, what actually restarts and what state is recovered?
Handling an uncertain external actionCan the system inspect whether the action happened or retry without duplicating it?
Receiving changed decisionsHow does the active work learn that a requirement or priority changed?
Independent working versionsCan separate attempts be preserved and stale updates detected?
Effective permissionsWhich restrictions are enforced by the application or execution environment?
Review and notificationWhat detects the event, invokes the method, and sends an authorized request?
Waiting and completionHow are working, waiting, blocked, and completed states distinguished and resumed?

For current implementation details, use the official documentation for your product and version. OpenAI's compaction guide describes one approach to carrying state across context windows. AWS's documentation explains general retry/idempotency and pause/resume concepts. These links do not establish that your agent product implements those capabilities or that you should adopt those services.

Harmless challenges that make limitations visible

Use disposable copies and fictional records. These are proposed tests, not assertions that your product will pass.

A correction survives. Give an agent a current decision and a superseded one with clear labels. Prepare the next assignment, start fresh, and inspect which decision governs the output. Then change a relevant detail. Success requires appropriate use, not repeating the previous answer.

An action has an uncertain outcome. Use a test application or mock record store. Arrange for a sample record to be created while the acknowledgment is hidden or lost. Inspect what the system does next. Does it read back the result, recognize an operation identifier, or create a duplicate? Do not simulate this using payments, real messages, or customer commitments.

A stale update arrives. Give two contributors a copy of version 7. Advance the shared record to version 8 through an authorized test change. Have the other contributor return its version-7-based work. Inspect whether the new information is preserved and the conflict is resolved. A rejection of a stale write preserves state; it does not decide which substantive change should win.

A narrow check passes. Use the building case or an equivalent task. Make one check pass while a meaningful requirement fails. Inspect whether the agent notices the gap and changes its completion claim. Avoid changing the requirement merely to obtain a passing result.

A human decision matters. Present a new request that conflicts with an approved commitment. Inspect whether the agent preserves the distinction, prepares a useful question, and continues independent authorized work. If it assumes the request was accepted, revisit how decisions are represented and checked.

Interpreting the result

An error can reveal missing information, unclear authority, poor retrieval, inadequate checking, a capability limit, or several interacting causes. Keep the explanation proportionate to the evidence. A successful small trial supports a next decision about that setting; it does not establish general reliability.

The useful result is a better account of how your work can proceed, what the agent can do, where your judgment belongs, and what still needs to change. Extend the run when that account is supported by what you have observed.